Page 33 - 1_8(1)
P. 33

Types
                                        doors,
                                                                                                        tension.
                                                                      of
                                                                                                   and splices.
                                 placement,
                                                                                Introduction:
                                                                                                              Shear in Beams:
                                        windows,
        KHUZDAR
                                 ready
                                                                                               Columns & Footings:
              BALOCHISTAN
          UET
                                                                      equipment,
                                 mix
                                        floors,
                                                                        Construction Equipment:
                                                   Construction Methodologies:
                                                                      analysis
                                 concrete
                                        building
                                                                      of
                                 etc.
                                                                                                      Bond, Anchorage &Development Length:
                                                                      capital
                                        finishes
                                                                                    CONSTRUCTION ENGINEERING 3 (2 + 1)
                             planar Construction aspects related to services.
                                                                      and
                                        and
                                 Construction
                                        water
                                                                      operating
                                 joints,
                                                       considerations, Layout techniques with special reference to buildings.
                                                                      costs,
                                              de-watering, shoring and bracing, sheet piling etc., In-situ and pre-
                                 Mass
                                                                   Maintenance and repair costs. Productivity and cost effectiveness.
                                                                                         structural design of simple rectangular footing and combined footing.
                               concreting, Plinth beams and plinth protection. Planar and non-
                                        proofing.
                                                               Construction Aspects of Engineering Projects and Layout Techniques:
                                                             An overview of construction aspects for different types of engineering
                                                                                                     Design and detailing for bond, anchorage, development length, laps
                                                                            Building permits, codes and construction standards, Sustainability.
                                                                    Depreciation and its methods of estimation. Investment costs,
                                                                                                          towards solution of diagonal tension problem, Design for diagonal
                                                                                                            Shear stress in reinforced concrete sections, models and analogies
                                      Protection of adjacent Structures. Mechanized construction. Design
                                          concrete floors, Planar and non-planar roofing systems. Masonry,
                                            cast concrete construction of buildings, slab on grade, plain cement
                                    and use of formwork for various building units/ members. Methods
                                                                                           under pure compression and with eccentric loading, Isolated footings,
                                                                                             Analysis of sections in pure compression, Design of short columns
                                  of concreting vertical and horizontal members, including mechanized
                                                of particular problems arising out of condition of sub-soil at site e.g.
                                                                              Construction projects, Project goals and objectives, Project categories,
                                                         and pavements. Site selection and orientation of building, Grading
                                                           projects, e.g., buildings, retaining structures, hydraulic structures
                                                  Methodologies for Excavation in different types of soils and solution
                       Column:
                    columns.
                                                           standard
                           Cylinders:
                                                                                  contractor’s
                                                                                                   Introduction:
                                                  Stress Analysis:
                                                                                  site
                                                           Deviation,
                                            strain rosette solution.
                                                                                  (team)
                                                                   Schedule and Cost Control,
                               for ductile and brittle materials.
                                                      MECHANICS OF  SOLIDS-II 3 (2 + 1)
                                                           Probability
                                                                                                            Sixth Semester
                         Thin, Thick and Compound Cylinders
                                      Introduction to Theory of Elasticity:
                                                                                  organization
                                                                                                       CONSTRUCTION MANAGEMENT 3 (3+0)
                                                                                  chart,
                                                           distribution,
                                 Theory of Yielding/Failure (Plastic Limit Analysis):
                                                                                        Project Scoping, Bidding and Preconstruction Planning:
                                                           Beta
                                                                                           Value engineering, normal track versus fast track construction
                                                                                  preliminary
                                                           curves
                                                           and
                                                               Project Planning, Scheduling and Controlling by Probabilistic Models:
                                                                              Project Planning, Scheduling and Controlling by Deterministic Models:
                                                                                  schedules,
                                                           center
                                                           limit
                                                                                  mobilization
           01
                                     Stress tensor, plane stress and plane strain problems and formulation of stress function.
                     Stability of columns, conditions of equilibrium, eccentrically loaded columns, initially imperfect
                                                                       the minimum total cost of a project; Resource scheduling and leveling; Cost loaded schedule, S-
                                                                                  plan.
                                                           theorem.
                                              and twisting moment. Mohr’s circle for stress and strain, relationships between elastic constants,
                                                Analysis of Stress and Strain at a point due to combined effect of axial force, shear force, bending
                                                                        Diagramming Method (PDM), Scheduling using Rectangular bar chart; CPM Scheduling; Determining
                                                             Program Evaluation & Review Technique (PERT), Statistical tools including mean, variance and
                                                                     curve, Cash flow analysis, Project control during construction; Record keeping, Project supervision;
                                                                                    planning aspects including area and site investigation, constructability review, site layout planning,
                                                                                             industry, project management objectives, processes and responsibilities, Project Life Cycle (PLC),
                                                                                      Defining project scope, Pre-Qualification process, Bidding process, overview of preconstruction
                                                                                               improved organization and management structures with particular reference to local construction
                                                                          Establishing activity sequencing; Arrow Diagramming Method (ADM) overview; Precedence
                                                                            Work Breakdown Structure; Project activities and their types; Estimating activity durations,
                                                                                                 The construction industry, nature and challenges, key players, Management issues and need for