Page 33 - 1_8(1)
P. 33
Types
doors,
tension.
of
and splices.
placement,
Introduction:
Shear in Beams:
windows,
KHUZDAR
ready
Columns & Footings:
BALOCHISTAN
UET
equipment,
mix
floors,
Construction Equipment:
Construction Methodologies:
analysis
concrete
building
of
etc.
Bond, Anchorage &Development Length:
capital
finishes
CONSTRUCTION ENGINEERING 3 (2 + 1)
planar Construction aspects related to services.
and
and
Construction
water
operating
joints,
considerations, Layout techniques with special reference to buildings.
costs,
de-watering, shoring and bracing, sheet piling etc., In-situ and pre-
Mass
Maintenance and repair costs. Productivity and cost effectiveness.
structural design of simple rectangular footing and combined footing.
concreting, Plinth beams and plinth protection. Planar and non-
proofing.
Construction Aspects of Engineering Projects and Layout Techniques:
An overview of construction aspects for different types of engineering
Design and detailing for bond, anchorage, development length, laps
Building permits, codes and construction standards, Sustainability.
Depreciation and its methods of estimation. Investment costs,
towards solution of diagonal tension problem, Design for diagonal
Shear stress in reinforced concrete sections, models and analogies
Protection of adjacent Structures. Mechanized construction. Design
concrete floors, Planar and non-planar roofing systems. Masonry,
cast concrete construction of buildings, slab on grade, plain cement
and use of formwork for various building units/ members. Methods
under pure compression and with eccentric loading, Isolated footings,
Analysis of sections in pure compression, Design of short columns
of concreting vertical and horizontal members, including mechanized
of particular problems arising out of condition of sub-soil at site e.g.
Construction projects, Project goals and objectives, Project categories,
and pavements. Site selection and orientation of building, Grading
projects, e.g., buildings, retaining structures, hydraulic structures
Methodologies for Excavation in different types of soils and solution
Column:
columns.
standard
Cylinders:
contractor’s
Introduction:
Stress Analysis:
site
Deviation,
strain rosette solution.
(team)
Schedule and Cost Control,
for ductile and brittle materials.
MECHANICS OF SOLIDS-II 3 (2 + 1)
Probability
Sixth Semester
Thin, Thick and Compound Cylinders
Introduction to Theory of Elasticity:
organization
CONSTRUCTION MANAGEMENT 3 (3+0)
chart,
distribution,
Theory of Yielding/Failure (Plastic Limit Analysis):
Project Scoping, Bidding and Preconstruction Planning:
Beta
Value engineering, normal track versus fast track construction
preliminary
curves
and
Project Planning, Scheduling and Controlling by Probabilistic Models:
Project Planning, Scheduling and Controlling by Deterministic Models:
schedules,
center
limit
mobilization
01
Stress tensor, plane stress and plane strain problems and formulation of stress function.
Stability of columns, conditions of equilibrium, eccentrically loaded columns, initially imperfect
the minimum total cost of a project; Resource scheduling and leveling; Cost loaded schedule, S-
plan.
theorem.
and twisting moment. Mohr’s circle for stress and strain, relationships between elastic constants,
Analysis of Stress and Strain at a point due to combined effect of axial force, shear force, bending
Diagramming Method (PDM), Scheduling using Rectangular bar chart; CPM Scheduling; Determining
Program Evaluation & Review Technique (PERT), Statistical tools including mean, variance and
curve, Cash flow analysis, Project control during construction; Record keeping, Project supervision;
planning aspects including area and site investigation, constructability review, site layout planning,
industry, project management objectives, processes and responsibilities, Project Life Cycle (PLC),
Defining project scope, Pre-Qualification process, Bidding process, overview of preconstruction
improved organization and management structures with particular reference to local construction
Establishing activity sequencing; Arrow Diagramming Method (ADM) overview; Precedence
Work Breakdown Structure; Project activities and their types; Estimating activity durations,
The construction industry, nature and challenges, key players, Management issues and need for